Newsflash

Price Builders and Developers Inc., LLC is a 100% Minority-Owned Corporation and an Equal Opportunity Employer. 

See our Jobs section for the latest hiring information!

 
Home arrow PRP Well Boom
PRP Well Boom

 

 

PRP WellBoom® is designed to facilitate testing in groundwater monitoring wells and is much less costly than traditional methods.

When installed, it submerges about 50% and adjusts to changing water levels. It remains bouyant until depleted.
Not only will the WellBoom absorb “free product” on contact, it won’t allow “leaching”. It then promotes
the rapid bio-degradation of the absorbed, groundwater-contaminating hydrocarbons!

The WellBoom’s most optimal performance will occur when the water temperature is in a range of 35 - 95 degrees Farenheit.

Simple to install, simple to maintain with
no costly disposal of messy, smelly, oil-soaked material required when

WellBoom is done. Simply throw the boom casing in the trash!

 
© 2010 Price Corporation Group
Joomla! is Free Software released under the GNU/GPL License.